NJ Turnpike and Parkway Tolls Were Supposed to Be Temporary

Kevin Hill grabbing a NJ Turnpike toll ticket, Sopranos style: Tolls Were Temporary since 1951

On January 1, 2027, tolls on the New Jersey Turnpike and the Garden State Parkway go up another 3%. If that sentence feels familiar, it should.

NJ.com reported on November 17, 2026 that the increase is part of the $2.9 billion budget the Turnpike Authority's commissioners approved that week. It is the sixth annual 3% "indexing" increase since the Authority adopted automatic yearly increases in 2020, and the sixth straight January increase since that indexing actually started on January 1, 2022. There was a much larger hike in 2020, then a gap in 2021, and then a 3% bump every January 1 from 2022 through 2027.

The Authority gave itself that indexing power in May 2020, when it also approved a 36% increase on the Turnpike and a 27% increase on the Parkway, effective September 13, 2020. NJ.com, counting the 2020 hike together with the six 3% increases, reported that tolls will have gone up a total of 54% on the Turnpike and 45% on the Parkway since 2020.

Those percentages are NJ.com's figures, not a compounded calculation. What is not in dispute is the direction: the tolls keep moving, by design, and they are not coming off.

The money is tied to the Authority's capital plan. NJ.com reported that the 2027 budget helps fund projects including the start of the Newark Bay Bridge replacement, now estimated at $6.88 billion, and structural repairs on the Parkway's Driscoll Bridge. A ceremonial groundbreaking for the new Newark Bay Bridge was held in Bayonne on November 5, 2026, the 75th anniversary of the Turnpike's opening. The Authority has said the program is funded through toll revenue, not city, county, state, or federal tax dollars.

I am not here to argue that a 70-year-old bridge should be left alone. I am here to talk about something New Jersey drivers have been told, in one form or another, since these roads were built: that the tolls were supposed to be temporary.

"Temporary" had a date on it

The New Jersey Turnpike Authority says the Turnpike was the first modern-day toll road in New Jersey, and the third in the nation, when it opened in 1951. The first 44-mile stretch, from Exit 1 in Deepwater to Exit 5 in Westampton, opened on November 5, 1951, according to the New Jersey Historical Society. The Parkway opened to traffic in 1954. It runs 173 miles from the Cape May-Lewes Ferry in Cape May to the New York State line at Montvale. A 2001 state press release, looking back, said the Parkway opened in 1955, which is when the main Cape May-to-Paramus route was in place. It was later extended to meet the New York State Thruway.

These were not supposed to be toll roads forever. They were financed as self-liquidating projects: sell bonds, build the road, collect tolls until the debt is paid, and then the tolls were supposed to come off.

For the Parkway, that was written into the original financing. When the Legislature created the New Jersey Highway Authority in 1952, it authorized the road as a self-liquidating toll project, with a state guarantee of $285 million in Authority bonds that voters approved that November. The Authority's own 1950s account, The First Five Years of the Garden State Parkway, said the state-guaranteed bonds issued in 1953 were to mature serially through 1988, and that a grand total of $330 million in Authority bonds, all to be redeemed by Parkway revenue, would finally mature in 1988. Contemporary state materials put it in plain language: tolls paid by users were to retire the Authority's bonds within 35 years.

1988 came and went. The tolls did not.

The Turnpike was built on the same idea. In 1964, the New Jersey Supreme Court described the arrangement this way in Safeway Trails, Inc. v. Furman:

"The operations of both Authorities are designed to be financially self-liquidating. The statute contemplates that upon payment of all bonds and notes, the Turnpike shall become part of the State Highway Department, to be operated free of tolls. N.J.S.A. 27:23-16."

A 1951 paper on the still-unfinished Turnpike, presented at Purdue University's Road School, said financing surveys indicated the bonded debt would be repaid well before the bonds' maturity in 1985.

The statute the Court was reading has been amended since then, including in the 2003 merger of the Highway Authority into the Turnpike Authority. The current text of N.J.S.A. 27:23-16 still says that when the bonds and interest have been paid, or enough money has been set aside to pay them, the projects "shall become part of the State highway system." It now also says they "shall thereafter be operated and maintained by the authority." It no longer says "free of tolls."

That is how a temporary user fee becomes a permanent one. The original bonds get refinanced. New bonds get issued for widenings, interchanges, and replacement bridges. The debt is never quite retired, so the moment when the tolls are supposed to come off never quite arrives.

Promises to take them off, then a merger that kept them on

People in New Jersey have not been quiet about this.

On May 31, 2001, Acting Governor Donald T. DiFrancesco signed Executive Order 128. The first two recitals are worth reading in full, because a governor put them in an official order:

"WHEREAS, when the New Jersey Highway Authority (the 'Authority') was first established in 1952, it was widely understood by the public that tolls on the Garden State Parkway (the 'Parkway') would only be necessary until such time as the bonds financing the cost of the construction of the Parkway could be retired; and"

"WHEREAS, the Parkway has been a toll road for nearly 50 years and there is no existing plan or timetable to either permanently retire the bonds of the Authority or to phase out tolls on the Parkway..."

That August, DiFrancesco went further. A New Jersey Department of Transportation press release dated August 9, 2001, announced a plan for one-way, free-flow E-ZPass, capital improvements, "and the total elimination of Parkway tolls in 10 years." The fact sheet attached to that release said, flatly, "The Garden State Parkway will be toll-free in 2012."

2012 came and went, too.

What did happen, starting in the mid-2000s, was one-way tolling at most Parkway barrier plazas. The booths in one direction came down, which helped the backups. The tolls themselves stayed. You can see that system on the official 2026 Parkway E-ZPass schedule: Pascack Valley, Essex, Raritan, Barnegat, and Great Egg collect southbound; Bergen, Union, Asbury Park, New Gretna, and Cape May collect northbound; Toms River still collects in both directions.

In 2003, the two agencies became one. On May 27, 2003, Governor James E. McGreevey signed legislation merging the New Jersey Highway Authority into the New Jersey Turnpike Authority. The state's press release said the plan would restructure the debt of both authorities, produce savings, and "avoids toll increases on the Garden State Parkway." The consolidation took effect that July, after the debt was refinanced. One agency, one combined debt, and no plan to take the tolls off.

I looked for a clear, on-the-record pledge from Governor Christine Todd Whitman or Governor Chris Christie to remove Turnpike or Parkway tolls. I did not find one I could stand behind. Whitman was the governor who rolled out E-ZPass on the Parkway. Christie opposed new tolls on untolled interstates and later inherited increases that had already been approved. The documented "these tolls should come off" record is older than that, and it is already disappointing enough.

What you actually pay in 2026, and what 2027 looks like

As of mid-November 2026, the Turnpike Authority had posted 2026 printable schedules and had not yet posted a 2027 schedule. The 3% increase is approved to take effect January 1, 2027. Where I give a 2027 figure below, it is a straight 3% calculation on a published 2026 fare, rounded to the nearest cent, not an official 2027 tariff.

New Jersey Turnpike, full-length trip. NJ.com and ROI-NJ both reported the same 2026 fares for a passenger car on the 117-mile trip between the Delaware Memorial Bridge and the George Washington Bridge:

  • NJ E-ZPass, peak: $21.88 (about $22.54 after a 3% increase)

  • NJ E-ZPass, off-peak: $16.40 (about $16.89)

  • Cash: $22.00 (about $22.66)

On a 117-mile trip, that 2026 peak E-ZPass fare works out to about 18.7 cents a mile, and the off-peak fare to about 14.0 cents a mile. Those per-mile figures are mine, from the published fare divided by the length those outlets used for the trip. They are not an official Authority rate.

Garden State Parkway. The official 2026 NJ E-ZPass Class 1 rates are $2.25 at most main-line barrier plazas and $1.13 at Toms River. Most ramp plazas are $0.79, with higher rates at a handful of ramps including Saddle Brook, Union, and Eatontown ($2.25), Watchung ($1.13), and East Orange ($1.57). After a 3% increase, a typical main-line plaza would be about $2.32, and Toms River about $1.16.

Because most barriers collect in only one direction, a passenger car running the full Parkway northbound or southbound is typically collected at six main-line plazas: five at $2.25 plus Toms River at $1.13, which is $12.38 on the 2026 E-ZPass schedule, before any ramp tolls. That is about 7.2 cents a mile over the Parkway's 173 miles, again a derived figure, not an official per-mile tariff. A 3% increase would put that through trip at about $12.75.

The official Parkway schedule defines peak periods as 7:00 to 9:00 a.m. and 4:30 to 6:30 p.m. Monday through Friday, and all day Saturday and Sunday. Those hours matter for some discounts, especially for trucks. For a regular passenger car with NJ E-ZPass, the Parkway plaza rates above are the posted Class 1 fares.

And if you live in Bergen County, the Turnpike and the Parkway are often not the only tolls in the week. ROI-NJ reported that Port Authority peak E-ZPass car tolls rose to $16.79 on January 1, 2026, at the George Washington Bridge, the Lincoln and Holland tunnels, and the Staten Island crossings. That is a separate agency and a separate increase. It is also part of what it costs to live and drive here.

How that compares with other states

Per-mile comparisons are easy to abuse, because every road prices differently: some publish a straight per-mile rate, some add a fee every time you enter a new segment, some have peak pricing, and some charge out-of-state E-ZPass holders more. I am using official 2026 (or late-2025) passenger rates, and I am leaving out any road whose numbers I could not verify from a primary source. I could not find an official Mass Pike dollar schedule I trusted, so Massachusetts is not in the table. For the bigger picture on why New Jersey drivers pay so much, see my earlier post, Toll Trouble: why New Jersey drivers pay the highest rates in the nation.

RoadWhat the figure is2026 passenger rateSource
New Jersey TurnpikeFull 117-mile trip, Delaware Memorial Bridge to George Washington Bridge, NJ E-ZPass$21.88 peak / $16.40 off-peak (about 18.7¢ / 14.0¢ per mile, derived)NJ.com, ROI-NJ
Garden State ParkwayTypical full-length main-line trip, NJ E-ZPass, six one-way barriers$12.38 (about 7.2¢ per mile over 173 miles, derived)NJTA 2026 Parkway E-ZPass schedule
Pennsylvania TurnpikeOfficial calculation on the mainline and Northeast Extension7.3¢ per mile plus a $1.13 fee per segment, effective Jan. 4, 2026PTC 2026 Toll Calculation Guide
Pennsylvania TurnpikeOfficial E-ZPass fare, Gateway (Ohio border) to I-95 Delaware River Bridge (New Jersey border)$62.76Same PTC guide, Gateway Plaza schedule
Ohio TurnpikeOfficial Class 1 E-ZPass per-mile rate, effective Jan. 1, 20267.3¢ per mileOhio Turnpike news release, Dec. 11, 2025
Ohio TurnpikeOfficial full 241-mile trip, Class 1 E-ZPass$19 westbound / $16 eastbound (westbound includes a round-trip flat rate at Eastgate)Same release
New York State ThruwayOfficial mainline per-mile rate, 2-axle passenger4.69¢ with a New York E-ZPass; 8.21¢ for non-New York E-ZPass / Tolls by Mail. Proposed Jan. 1, 2027: 4.92¢ / 8.61¢. Some gantries are extra.NYSTA current and proposed rate charts
Florida's Turnpike (SR 91 mainline)Official SunPass rate, 265 miles (MP 0X to MP 309), as of Dec. 7, 20257.2¢ per mile, or $19.05 for that stretchFlorida's Turnpike Enterprise, Appendix A
TennesseeStatewide toll roadsNone. TDOT: "There are no toll roads in Tennessee."TDOT, via WSMV, March 28, 2025


A few things the table should not be used to do. It should not be used to claim that every mile of New Jersey driving is the most expensive in America. On a pure per-mile basis, a full run of the Parkway is in the same neighborhood as the published per-mile rates in Pennsylvania, Ohio, and Florida. The Turnpike's full-length peak fare is a different story: it is a shorter, busier road, and 18.7 cents a mile is well above those published per-mile rates. Pennsylvania's $0.073-plus-segment-fee formula also adds up on a long trip; the official Ohio-line-to-New-Jersey-line E-ZPass fare is $62.76.

The comparison that matters for a lot of the people I sit with is simpler. If you are leaving New Jersey for a state with little or no tolling, this line item can shrink a lot, or disappear.

Tennessee has no toll roads. That is not a slogan. It is what the Tennessee Department of Transportation said in 2025 when it warned residents about a fake "unpaid toll" text scam.

The Carolinas are not quite toll-free, but they are close enough that it surprises people coming from North Jersey. The N.C. Turnpike Authority operates a handful of facilities, including the Triangle Expressway, the Monroe Expressway, and express lanes on I-77 and I-485. Those are specific roads in specific metros, not a 173-mile commuter spine you pay every time you go to the shore or through Bergen County. In South Carolina, the main toll road is the roughly 16-mile Southern Connector (I-185 Toll) near Greenville. The rest of the state's interstate system is not a turnpike.

What New Jersey equity can buy in the Carolinas, and the tax comparison, is a bigger conversation than tolls alone. Tolls are one more number in that math, not the whole math.

This is what expensive feels like, in pieces

Nobody usually leaves New Jersey because of a 3% toll increase. They leave because New Jersey’s cost of living keeps stacking up: the property-tax bill, the income-tax rate, the insurance, the highway tolls that were supposed to be temporary and the bridge tolls on top of those, and a house that is worth a lot until you try to replace it in the same state.

The New Jersey Division of Taxation's 2025 average residential tax bill was $10,340 statewide and $14,200 in Bergen County. The Tax Foundation has put New Jersey's effective property-tax rate on owner-occupied housing at the top of the national list. United Van Lines' 2025 National Movers Study again had New Jersey as the country's top outbound state.

Sellers who have already established residency in another state should also plan for New Jersey’s exit tax, the nonresident withholding collected at closing.

A few extra dollars at a Parkway plaza will not, by itself, make someone call a mover. Watching the "temporary" tolls get another automatic increase, for the sixth January in a row, is the kind of thing that makes people start doing the rest of the math.

If you are thinking about selling a New Jersey home and buying in another state, I can help with both sides of that move. I handle the sale here, and through my referral network I connect you with a local agent where you want to land. Start on my sell in New Jersey and buy out of state page, or on buying a home outside New Jersey. If you want to weigh a traditional listing against a cash or hybrid sale before you go, start with Compare Your Selling Options or this overview of your options for selling a New Jersey house. If you want a straight conversation about what your house could net, and what that equity could do somewhere with a lighter cost of living, call or text me at 201-214-1349, or use the contact page.

Sources

This post is general information, not legal, tax, or financial advice, and it is not a prediction about future toll votes or capital projects. Toll schedules change. The 2027 dollar figures above are 3% calculations on published 2026 fares, because an official 2027 schedule had not been posted as of this draft. Confirm current rates with the New Jersey Turnpike Authority and the other agencies cited before you rely on a number.

Kevin Hill, REALTOR® | Keller Williams Valley Realty
123 Tice Blvd, Suite 100, Woodcliff Lake, NJ 07677
201-214-1349 | Kevin@escapefromnewjersey.com
NJ license #0894817

Each office is independently owned and operated.

Kevin Hill

Kevin Hill is a 20 year+ real estate professional with Keller Williams Valley Realty in Woodcliff Lake, NJ who escaped to sunny South Florida for 5 years but “Just when I thought I was out, they pulled me back in!” and moved back to the Garden State. If you have any questions or want to see a topic covered in my blog, contact me at Kevin@escapefromnewjersey.com or 201-214-1349.

https://www.escapefromnewjersey.com
Next
Next

Selling Your New Jersey Home and Buying in the Carolinas